Shanghai Dianmai Transmission presents this model to you: the four sets of linked screw jack lift platform, the screw jack lift platform. Many times, a single screw jack cannot meet the usage requirements, such as insufficient torque, insufficient stability, or insufficient area. At such times, we need to consider using a lift platform and utilize multiple screw jacks to synchronously complete and meet our usage requirements.

The screw jack lift platforms include: two sets of linked, three sets of linked, four sets of linked, six sets of linked, eight sets of linked, and even more sets of linked, which can all be combined and used. As for the specific number of sets to be used, it can be selected according to the actual working condition requirements. If there are any questions in this regard, you are also welcome to consult Shanghai Dianmai Transmission.

Description

Product Introduction:

Four sets of linked screw jack lift platform

Shanghai Dianmai Transmission presents this model to you: the four sets of linked screw jack lift platform, the screw jack lift platform. Many times, a single screw jack cannot meet the usage requirements, such as insufficient torque, insufficient stability, or insufficient area. At such times, we need to consider using a lift platform and utilize multiple screw jacks to synchronously complete and meet our usage requirements.

The screw jack lift platforms include: two sets of linked, three sets of linked, four sets of linked, six sets of linked, eight sets of linked, and even more sets of linked, which can all be combined and used. As for the specific number of sets to be used, it can be selected according to the actual working condition requirements. If there are any questions in this regard, you are also welcome to consult Shanghai Dianmai Transmission.

This time, what is mainly introduced to friends is the four sets of linked. Please refer to the above figure. The components are:
Four sets of screw jacks;
Three sets of steering gearboxes;
One electric motor;
Four linkage rods;
Eleven couplings.

It should be noted that the motor can be installed on the inside or the outside. The same layout method of the four sets of linked can also be flexibly adjusted. For example, if the motor position interferes, it can be considered to install the motor farther away and connect it with a linkage rod. However, in that case, the required number of linkage rods needs to be appropriately increased. There are various motors that can be selected, such as stepper motors, servo motors, three-phase motors, single-phase motors, etc., and you can choose according to your own needs.

The above figure shows the layout method of placing the motor and the steering gearbox on the side. It is also possible to place the motor in the middle for layout. As long as it can meet our requirements, we can freely exert our imagination. See the figure below:

Four sets of linked screw jack lift platform/screw jack lift platform

This is another commonly used combination method of the four sets of linked screw jack lift platform. The motor is in the middle, and the principle is the same, which is also to make the screw jacks achieve the purpose of synchronous lifting. For more combination methods, welcome to consult Shanghai Dianmai Transmission.

Reviews

There are no reviews yet.

Be the first to review “Four sets of linked screw jack lift platform/screw jack lift platform”

Your email address will not be published. Required fields are marked *